Integration testing
From Wikipedia, the free encyclopedia
Integration testing (sometimes called Integration and Testing, abbreviated I&T) is the phase of software testing in which individual software modules are combined and tested as a group. It follows unit testing and precedes system testing.
Integration testing takes as its input modules that have been unit tested, groups them in larger aggregates, applies tests defined in an integration test plan to those aggregates, and delivers as its output the integrated system ready for system testing.
Contents |
[edit] Purpose
The purpose of integration testing is to verify functional, performance and reliability requirements placed on major design items. These "design items", i.e. assemblages (or groups of units), are exercised through their interfaces using black box testing, success and error cases being simulated via appropriate parameter and data inputs. Simulated usage of shared data areas and inter-process communication is tested and individual subsystems are exercised through their input interface. Test cases are constructed to test that all components within assemblages interact correctly, for example across procedure calls or process activations, and this is done after testing individual modules, i.e. unit testing.
The overall idea is a "building block" approach, in which verified assemblages are added to a verified base which is then used to support the integration testing of further assemblages.
The different types of integration testing are big bang, top-down, bottom-up, and back bone.
Big Bang: In this approach, all or most of the developed modules are coupled together to form a complete software system or major part of the system and then used for integration testing. The Big Bang method is very effective for saving time in the integration testing process. However, if the test cases and their results are not recorded properly, the entire integration process will be more complicated and may prevent the testing team from achieving the goal of integration testing.
Bottom Up: All the bottom or low level modules, procedures or functions are integrated and then tested. After the integration testing of lower level integrated modules, the next level of modules will be formed and can be used for integration testing. This approach is helpful only when all or most of the modules of the same development level are ready. This method also helps to determine the levels of software developed and makes it easier to report testing progress in the form of a percentage.
[edit] Limitations
Any conditions not stated in specified integration tests, outside of the confirmation of the execution of design items, will generally not be tested. Integration tests can not include system-wide (end-to-end) change testing.