Mathura Refinery
From Wikipedia, the free encyclopedia
The Mathura Refinery with a capacity of 6.00 MMTPA was set up at a cost of Rs.253.92 crores. The Refinery was commissioned in January, 1982 excluding FCCU and Sulphur Recovery Units which were commissioned in Jan, 1983. The refining capacity of this refinery was expanded to 7.5 MMTPA in 1989 by debottlenecking and revamping. A DHDS Unit was commissioned in 1989 for production of HSD with low sulphur content of 0.25% wt. ( max.). The present refining capacity of this Refinery is 8.00 MMTPA
This was in news for allegedly being the cause of yellowing of White marble of TAJ MAHAL at Agra.