Global Information Grid-Bandwidth Expansion
From Wikipedia, the free encyclopedia
The Global Information Grid Bandwidth Expansion (GIG-BE) Program was a major United States Department of Defense (DOD) net-centric transformational initiative executed by DISA. GIG-BE created a ubiquitous “bandwidth-available” environment to improve national security intelligence, surveillance and reconnaissance, information assurance, as well as command and control. Through GIG-BE, DISA leveraged DOD’s existing end-to-end information transport capabilities, significantly expanding capacity and reliability to select Joint Staff-approved locations worldwide. GIG-BE achieved Full Operational Capability (FOC) on Dec. 20, 2005.
Contents |
[edit] Scope
This program provided increased bandwidth and diverse physical access to approximately 87 critical sites in the continental United States (CONUS), Pacific Theater, and European Theater. These locations are interconnected via an expanded GIG core.
[edit] Capabilities and Services
GIG-BE provides a secure, robust, optical terrestrial network that delivers very high-speed classified and unclassified Internet Protocol (IP) services to key operating locations worldwide. The Assistant Secretary of Defense for Networks and Information Integration’s (ASD/NII) vision is a “color to every base,” physically diverse network access, optical mesh upgrades for the backbone network, and regional/MAN upgrades, where needed. “A color to every base” implies that every site has an OC-192 (10 gigabits per second) of useable IP dedicated to that site.
[edit] Implementation
After extensive component integration and operational testing, implementation began in the middle of the 2004 fiscal year and extended through calendar year 2005. The initial implementation concentrated on six sites used during the proof of Initial Operational Capability (IOC), achieved on Sept. 30, 2004. The GIG-BE Program Office conducted detailed site surveys at all of the approximately 87 Joint Staff-approved locations and parallel implementation in CONUS and overseas. The GIG-BE Program Office completed the Final Operational Test and Evaluation (FOT&E) at 54 operational sites on Oct. 7, 2005. On Dec. 20, 2005, the GIG-BE program achieved the milestone of Full Operational Capability.
[edit] References
[edit] See also
- Department of Defense Architecture Framework
- DoD Joint Technical Framework version 6.0
- DoD Business Enterprise Architecture
- Global Information Grid-Enterprise Services initiative
- Department Of Defense Directive (DoDD) 8100.01 "Global Information Grid - Overarching Policy", September 2002
- JTF-Global Network Operations
- Global Information Grid