Talk:Managing Stage Boundaries (SB)
From Wikipedia, the free encyclopedia
[edit] Example
The example is basically wrong. It would generate an exception report, if anything, depending on Work Package Tolerences and Stage Tolerences (although it would be reflected in the End Stage Report). Rich Farmbrough 10:01 24 August 2006 (GMT).
[edit] Links to Stage
Could you please make an article on this type of "stage" so that all the links go somewhere applicable? Otherwise, I think that all the "stages" marked as links should be de-linked. Cfrydj 15:56, 20 September 2006 (UTC)