Static Wikipedia February 2008 (no images)

aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu

Web Analytics
Cookie Policy Terms and Conditions Southeastern Anatolia Project - Wikipedia, the free encyclopedia

Southeastern Anatolia Project

From Wikipedia, the free encyclopedia

Current event marker This article or section contains information about planned or expected future infrastructure.
It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available on it.
Infrastructure stub mini pictogram.png

Economy of Turkey

Tourism
Companies
Istanbul Stock Exchange(ISE)
Companies listed on ISE
Turkish new lira
Central Bank of the Republic of Turkey
European Union-Turkey Customs Union
Baku-Tbilisi-Ceyhan pipeline(BTC)
Southeastern Anatolia Project
Foreign purchases of real estate in Turkey

Other Turkish Topics
Culture - Education
Geography - History - Politics
Turkey Portal

The Southeastern Anatolia Project (Turkish: Güneydoğu Anadolu Projesi, GAP) is a multi-sector integrated regional development project based on the concept of sustainable development for the 9 million people[1] living in a region. GAP's basic aim is to eliminate regional development disparities by raising people's income level and living standards; and to contribute to such national development targets as social stability and economic growth by enhancing the productive and employment generating capacity of the rural sector. Total cost of the project is 36 billion YTL, which 21 billion YTL of this investment was realized.[2] The real investment (corrected value) was 56% for the end of 2005. The project area covers 9 provinces (Adıyaman, Batman, Diyarbakır, Gaziantep, Kilis, Siirt, Şanlıurfa, Mardin, and Şırnak which are located in the basins of the Euphrates and Tigris and in Upper Mesopotamia.

This current activities under GAP covers sectors as (1)irrigation, (2) hydraulic energy production, (3) agriculture, (4) urban and rural infrastructure, (5) forestry, (6) education and (7) health. Water resources envisages the construction of 22 dams and 19 power plants (8 plants or 74% capacity was reached by 2005) and irrigation schemes on an area extending over 1.7 million hectares. 7 airports have been finished and active, GAP cargo airport (the biggest in Turkey) finished.

Contents

[edit] History

The first idea and decision to utilize the waters of the Euphrates and Tigris rivers belong to Atatürk, the founder of the Republic. In 1920s-1930s, the need for electrical energy was a priority issue. The Electricity Studies Administration was founded in 1936 to investigate how rivers in the country could be utilized for energy production. The Administration began its detailed studies with the "Keban Dam Project" and established observation stations to assess the flow and other characteristics of the Euphrates. The GAP as it is structured today, was planned in the 70s consisting of projects for irrigation and hydraulic energy production on the Euphrates and Tigris, but transformed into a multi-sector social and economic development program for the region in the early 80s. The development program encompassed such sectors as irrigation, hydraulic energy, agriculture, rural and urban infrastructure, forestry, education and health. With the development of new GAP Administrative structure in 1988-1989, Its basic objectives included the improvement of living standards and income levels of people so as to eliminate regional development disparities (Economic inequality) and contributing to national goals such as social stability and economic growth by enhancing productivity and employment opportunities in the rural sector.

Tensions between Turkey, Syria and Iraq were raised from time to time due to GAP. Syria and Iraq demanded more water to be released, while Turkey declined so as to form the dam reservoirs. Because of this GAP is one of the world's most well protected dam projects, especially against aircraft. GAP also almost came to a complete halt in the early 1990s due to the high level of Kurdistan Workers Party (PKK) activity in the region. The PKK is not only blamed for a number of funding cuts as funds were diverted to support the counter-terrorism effort, but is also blamed for damaging several dams and canals, as well as killing engineers working at the dams. A number of economic crises also played a very important part in the delays of GAP.

The UN embargo on Iraq (which was lifted after the Second Gulf War) had negative effects on development efforts and region's trade with Middle Eastern countries, which are its natural economic partners. Furthermore, imbalances in public financing delayed the financing needs of the project. Finally, a number of judicial questions needed clearing over the flooding of several historical sites as well as local residences as described in the "Social effect" section.

[edit] Strategic goal

Historically, Southeastern Anatolia was located on the trading route between East and West. The region had been an important source of cultural diversity. However the changes in the trading routes and the agricultural methods ended the old importance of the region.

The 1989 Master Plan had aimed to initiate the revitalization of the economic, social and cultural life in the region through an "integrated regional development project". The rise in the income of the region was directly transferred to restoration and revitalization of the cultural activities in the region, instead of moving into the national budget. This master plan did not reached its goals because of the issues stated under the introduction section. However, for this negative perspective, with the international community involvement, project added new dimensions and concepts to the definitions .

The concerns and concepts of the environment, sustainability and participation, which were either overlooked or totally absent in the original plan has been added with the UNDP support. The revised "GAP Regional Development Plan" with a new understanding is currently in place. The macro frame of the GAP Regional Development Plan (GAP-RDP) is drawn by 8th Five-Year Development Plan coordinated with the efforts under the "Program for Transition to a Strengthened Economy" prepared as a part of the process for Turkey's accession to the European Union.

[edit] Social effect

GAP region
GAP region

The project rests upon the philosophy of sustainable human development, which aims to create an environment in which future generations can benefit and develop. The basic strategies of the project include fairness in development, participation, environmental protection, employment generation, spatial planning and infrastructure development. In reaching these goals the primary objective of GAP is to normalise levels of development, income, and living standards between the southeastern region and other regions of Turkey. GAP is transforming the region completely by creating economic and social opportunities and promoting business. Critical infrastructure, such as airports and highways, is being constructed to support the development of the region. GAP will provide jobs to an estimated 3.5 million people directly.

[edit] Economic development

[edit] Irrigation

GAP is estimated to double Turkey's irrigable farmland. The increase of agricultural activity of GAP in its incomplete state is visible clearly on the USDA graph above. Cotton production increased from 150,000 metric tons to 400,000 metric tons, making the region the top cotton producer.

GAP will create 17,000 square kilometres (4.2 million acres) of farmland in the Harran plain alone, as visible on two USDA maps above.

Reports indicate that, due to irrigation from the Atatürk Dam, harvest yields of cotton, wheat, barley, lentils, and other grains in the Harran plain have tripled. A number of Agriculture Department backed innitiatives are encouraging farmers to experiment with new varieties of fruits, vegetables, and nuts that did not exist in the region prior.

As a result of GAP, land values, personal income, number of agricultural and personal vehicles of course has increased, even have tripled in the past eight years.

[edit] Fishing

GAP is being built in a region where water used to be a scarcity. With the vast number of lakes being formed, plans to use them as breeding spaces for commercial fishing are also underway. In the case of the Atatürk Dam the fishing industry in the region is already developing.

[edit] Power

The GAP also consists of 17 hydroelectric power plants. These will supply the energy equivalent of 22% of the anticipated total nationwide energy consumption in 2010. Providing 8,900 gigawatt hours (32 PJ), it is one of the largest series of hydroelectric power plants in the world.

[edit] Infrastructure

[edit] Dams

Centerpiece of the project: Atatürk Dam
Centerpiece of the project: Atatürk Dam

Southeastern Anatolia Project consists of 21 Dams:

  1. Atatürk Dam - Hydroelectric, Irrigation
  2. Batman Dam
  3. Birecik Dam
  4. Devegeçidi Dam
  5. Dicle Dam
  6. Karakaya Dam
  7. Karkamış Dam
  8. Keban Dam
  9. Kralkızı Dam
  10. Ilısu Dam - Hydroelectric - (controversial)

[edit] Maintenance

The reason for the sheer number of dams in the project, more than would at first appear needed, is maintenance. Dams need to be cleaned from the debris carried with the water flow. After a while the dam becomes obsolete as water flow slows down to inadequate levels. The dams will be shut down every 5 to 10 years for fall maintenance (also called fall cleanup). Water levels are normally lowest in fall. The extra dams are placed in service during this maintenance period.

In cases of natural disasters such as floods, the maintenance may be performed earlier. The plan is to have one or two dams spare in case an emergency shutdown of any dam is necessary. While shutting down a dam also shuts down irrigation channels linked to it, it can nevertheless continue providing power.

[edit] Engineering behind the project

Providing electricity and irrigation is challenging in a region as large as the one targeted by GAP. A constant flow of water is imperative.

Energy dissipator
Energy dissipator

Once a constant rate of flow is available, the water can be diverted to flow through water turbines to create alternating current, which can be channeled to cities across considerable distances. The energy dissipator (left) is the water flowing off of the turbines which are not visible but are embedded in concrete. However electricity is only part of the usage of the tons of water collected at the dam.

Radial floodgates
Radial floodgates

When dealing with tons of water, it has to be distributed evenly and slowly. Occasionally main channels will need maintenance, or may be damaged due to external reasons. In order to even assess the problem, tons of water need to be removed from the main channel. The best way to do this is to slow the overall flow from the main dam and redirect all water flowing originally through the damaged channel to backup channels. Radial gates serve this purpose, they regulate the flow of water. It is imperative to keep water flowing. Lack of the flow will not only compromise all irrigation linked to that channel but also all cities linked will experience a power outage.

Harran main channel
Harran main channel

After leaving the energy dissipator, water flows into a set of main channels, which flow in different directions supplying water to a greater area. They are the most critical part of a dam project aside from the dam itself. This is as critical as high-voltage transmission lines in power grids.

Sluice gates
Sluice gates

Sluice gates regulate the flow of water. If water flows too fast it will overflow and probably damage one or more of the channels, or flood irrigation fields. Multiple sluice gates regulate the speed of the flow on different sections of the channel. They can also be used like radial gates to cut water in channels.

After leaving the radial gates on the main channel, water flows to canals which are smaller and can carry less water. Flow regulators divert water on canals to distribution canals. Just like radial gates and sluice gates, flow generators can stop water flow if necessary. Distribution canals are the last step as far as engineers are concerned. It delivers water to different sections of large fields, pretty much an artificial river.

It is up to farmers to get the water from distribution channels to their crops for irrigation. There are different methods to do this; any one or a combination of earth distribution channel, furrow, and drip tubes can be used.

[edit] Sub-projects

The latest design of the project divides the GAP into smaller projects. Each project generates its own annual reports and activity sheets.

  • Management, Operation and Maintenance of GAP Irrigation Systems (GAP-MOM),
  • Regulation of Water in Irrigation Canals and Methods and Technologies for Water Saving,
  • Treatment of Urban Waste Water,
  • Re-use of Irrigation Discharge Water,
  • Protection of Biological Diversity,
  • Environmental Work in the GAP Region,
  • Environmental Work in the GAP Region - Tigris Basin,
  • Assessment of Climatic Conditions in the Region for Present Day and Future,
  • Adıyaman-Kuyulu Region Erosion Control Project,
  • Adıyaman-Diran Micro-Catchment Rehabilitation Project,
  • GAP Afforestation Project,
  • Participation in urban planning and zoning,
  • Resettlement and employment of people affected by dam lakes,
  • Atatürk Dam Lake Sub-Regional Development Plan,
  • Eco-city and eco-village planning and development in pilot localities.
  • Establishment of Multi-Purpose Community Centers (ÇATOM) for Women,
  • Improving the Income Level of People in Non-Irrigated Areas,
  • GAP Entrepreneur Support and Guidance Centers (GAP-GIDEM),
  • Project for On-Contract Animal Husbandry (GAP Rings Model),
  • Project for Joint Machinery Use (GAP OMAK),
  • Sub-Regional Development Plan Comprising Return to Villages and Rehabilitation,
  • Project for the Rehabilitation of Children Working in Streets.
  • Institutional Capacity Building,
  • Training and Extension Services for Farmers,
  • Land Consolidation,
  • Social Progress for Youth,
  • GAP Region Public Health Project.

[edit] Status of GAP

The water resources development component of the program envisages the construction of 22 dams and 19 hydraulic power plants and irrigation of 17,000 square kilometres of land. The water resources part of the project is expected to be completed by 2010 and the total cost of the project is estimated at $32 billion USD. The total installed capacity of power plants is 7476 MW and projected annual energy production reaches 27 billion kWh.

Status of the project as of June 2000
Completed Ongoing Planned
Power capacity
MW
4,490 898 1,947
Power production
MW (GWh/yr)
1,906 (16,704) 375 (3,286) 812 (7,119)
Irrigation area
km²
2,121.97 1,591.47 14,286.56
Number of dams 12 2 8
Number of hydropower plants 6 2 10

According to many estimates, the GAP's completion date of 2010 is unlikely to be achieved. Some dams, such as the one closest to Hatay, are long overdue for fall maintenance. Additionally, the GAP does not receive any funding from the World Bank or IMF, and it does not have a place on the current administration's agenda. It is thus receiving very little funding, further complicating matters and delaying completion.

[edit] Criticism of the project

[edit] Erasure of displaced peoples

For more details on this topic, see Cultural genocide.

The GAP has been criticized for the fact that damming the regional rivers will flood a significant portion of the historical Armenian[citation needed] and Kurdish homelands, effectively erasing the cultural and archaeological history of those displaced peoples. Further controversy results from the fact that the events of the Armenian Genocide, recognized by a wide array of international scholars but officially denied by Turkey, were geographically concentrated in the region that is to be flooded. Critics point out that the dam could effectively erase the evidence of ancient Kurdish, Armenian[citation needed]and Assyrian habitation in the region since the whole habitation for 10,000 years and Armenian Genocide took place near the small areas near that river.[citation needed]

[edit] See also

[edit] Notes

  1. ^ 9 million is 2005 value
  2. ^ value is for the end of 2005

[edit] External links

Static Wikipedia 2008 (no images)

aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu -

Static Wikipedia 2007 (no images)

aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu -

Static Wikipedia 2006 (no images)

aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu